Your PCB works great. Now what?
  • Investors want to see a real product
    Not breadboards and hot glue. You need something that looks production-ready for the next funding round.
  • Chinese factories need proper CAD
    They can manufacture anything, but they won't design it for you. No documentation = no quotes.
  • Thermal, EMI, drop tests matter
    Your prototype might work on the bench. Production units need to survive shipping, temperature swings, and certification testing.
We design enclosures that work in the real world

Concept & Fit

Industrial design that matches your brand
Component layout and thermal planning
Material and manufacturing method selection

Timeline: 2-3 weeks
Engineering
Production-ready CAD with tolerances
DFM optimization for your manufacturing method
Assembly instructions and BOM

Timeline: 3-4 weeks
Prototyping
3D printing, CNC, or silicone casting
Fit testing with your electronics
Iterations based on real assembly

Timeline: 1-2 weeks per iteration
Production Support
Factory-ready manufacturing files
Small series production (10-1000 units)
Direct shipping to your location

Timeline: varies by volume